The Lab · Lübeck, Germany

Selected
work.

Every brand has a story worth telling. This is ours — fresh from the BuonaLabs studio.

Identity lab

Branding & Illustrations

Full brand worlds — logotypes, packaging, art direction and illustration — built so every touchpoint tells the same story.

Atelierc

Premium Chocolateria

Chocolate treated like couture. Atelierc's monogram emblem, patterned wrap and handbag-shaped gift boxes turn every praline into a boutique purchase — packaging designed to be kept, not thrown away.

Belmont

French Mayonnaise

Mayonnaise with a Paris address. Belmont pairs a wood-lid jar and a monogram with loud label type, photographed like a café still life under the Eiffel Tower.

Brunch Out

Café & Brunch Spot

A sunny-side-up identity for an all-day brunch destination. Pixel-flavoured logotype, lilac-on-tomato palette and food-first art direction that makes avocado toast feel like an event — rolled out across cups, menus and social.

Cloud Cafe

Coffee Shop

A warm, craft-led identity for a speciality coffee shop. Characterful logotype and mascot printed straight onto the cups — designed to feel at home between the espresso machine and the morning rush.

Eken

Scandinavian Furniture

Nordic furniture, kept quiet. Eken's carved wordmark, oak and leather, and a catalogue that treats each piece like a designed object — inspired by nature, built for modern living.

Fiesta Fusion

Street Food Truck

Tacos on the move, flavour grooves. A loud, hand-lettered identity for a fusion taco truck — checkerboard greens, chunky type and a rolling taco mascot that's impossible to miss on the street or on the feed.

Forra

Botanical Brand

Forra — forest and flora. A quiet, editorial identity rooted in nature: a golden serif wordmark, hand-drawn botanical illustration and textured paper tones for a brand that grows slowly and deliberately.

Maxed

Protein Bar

Performance nutrition without the gym-floor clichés. Maxed pairs a heavyweight logotype with juicy colour-blocked wrappers — flavours you can tell apart from across the shelf, styled in playful set-design photography.

Mika Matcha

Modern Matcha

A modern matcha brand with a red-and-cream pouch, Japanese lettering and a small garden mark. Packaging that reads clearly from the shelf — 100% pure, made for the cha garden.

Milkish

Plant-Based Milk

Looks like milk — but it's not. A 100% almond plant-milk brand fronted by a cheeky cat mascot and bubble lettering, with bottle design and campaign scenes built to make the dairy aisle smile.

Muld

Mulled Wine

Made for those who make time. Muld revives the centuries-old ritual of spiced wine as a modern brewing kit — deep burgundy, editorial serifs and a red script that flickers like a solstice fire.

Nalu

Hawaiian Perfume

A Hawaiian perfume poured into a hibiscus bottle. Palm, pink light and a scent line of hibiscus, coconut and ocean mist — the whole identity feels like warm air off the water.

Ophie

Lip Gloss

Beauty branding with a jeweller's touch. Ophie's silver butterfly emblem wraps glassy pink glosses — and the accompanying product renders were built to match: liquid, light-catching, unmistakably premium.

Sunwhip

Self-Tanning Mousse

A sun-soaked identity for a self-tan brand that doesn't whisper. Hot-pink bubble logotype over citrus waves, beach-first art direction — plus launch-ready motion assets, included below.

The Mariner's Club

Coastal Luxury Hospitality

Old-world hospitality, new-world polish. A coastal luxury identity told through gold-foil welcome cards, engraved serifs and grand-hotel greens — the kind of brand you check into.

Waffle Spot

Waffle Café

A pastel café identity for a waffle spot. Script wordmark, café furniture and waffle photography made to work on the menu, the window and the feed.

Motion lab

Ad Promo Video Production

Story-driven promo ads and product films — scroll-stopping, cinematic, and built for social-first placement.

3D studio

3D Modelling & Video Production

High-fidelity 3D assets, product visualizations and cinematic renders that make ideas look tangible before they exist.

Build layer

Website Development

Marketing sites, web platforms and dashboards — fast, secure, and ready for real users. Click any project to open the live site.

grafikland-helmstedt.de Open live
Grafikland — Print Shop, Helmstedt — website preview Explore the live site

Grafikland

Print · E-commerce

A print shop in Helmstedt — configure a product, upload the artwork and get an automatic file check for resolution, colour and bleed before anything goes to press. Built for private orders and business accounts.

ownyourpics.com Open live
OwnYourPics — Free your iCloud — website preview Explore the live site

OwnYourPics

Product · Marketing

The product site for an iOS photo backup app. Originals go to storage you control — a local drive, Dropbox, S3 or your own server — with a clear privacy story and a direct path to the App Store.

Build layer

Mobile App Development

Native-quality iOS & Android apps built with React Native — tap any project to open a live, interactive demo right in your browser.

PizzaBuona — mobile app preview

PizzaBuona

iOSAndroid

Order pizza, pinsa and pasta for delivery or pickup in Lübeck. One app on iPhone and Android — live menu, extras and checkout.

Aurora — mobile app preview
Open live demo

Aurora

Fintech · Neobank

Instant transfers, an animated spending breakdown and a freezable virtual card. Move money live on the in-app keypad.

Pulse — mobile app preview
Open live demo

Pulse

Fitness · Health

Close your activity rings, then start a GPS-tracked workout with a live route, pace and heart rate.

Sonar — mobile app preview
Open live demo

Sonar

Music · Streaming

A living Now-Playing screen with a spinning sleeve, real-time equalizer and scrubbable progress.

Serene — mobile app preview
Open live demo

Serene

Wellness · Meditation

Guided sessions, mood check-ins and sleep stories. Tap the centre to run the live breathing exercise.

Ember — mobile app preview
Open live demo

Ember

E-commerce · Coffee

Browse the menu, customise every cup, build your bag and check out — the whole flow is interactive.

Apex — mobile app preview
Open live demo

Apex

Marketplace · Automotive

Browse listings and open any car for a live finance calculator — drag the deposit and watch the monthly payment update.

Forno — mobile app preview
Open live demo

Forno

On-demand · Food Delivery

Build your pizza with a live total, then track it from the oven to your door on a live map with a real-time ETA.

Kova — mobile app preview
Open live demo

Kova

Retail · E-commerce

Open a product to pick colour and size, then add to a live bag with promo codes and an animated checkout.

OwnYourPics — mobile app preview
App Store

OwnYourPics

Photos · iOS

Back up a photo library to a destination you own, then free the space in iCloud. Originals and metadata stay intact. On the App Store for iPhone and iPad.

On-chain lab

Crypto & Blockchain

On-chain tooling for auditors, researchers and developers — decompile bytecode, recover ABIs, and analyze smart contracts across every major EVM network.

evmdecompiler.buonalabs.com Open live
EVM Decompiler — Free Online Bytecode to Solidity Tool — website preview Explore the live tool

EVM Decompiler

Crypto · Smart Contracts

A free online EVM decompiler — paste a contract address or bytecode and get Solidity-like output, ABI recovery, control-flow graphs and multi-chain support across Ethereum, Base, Arbitrum and 30+ networks. No wallet, no install.

Character lab

Game-Ready Characters

Turn a raw scan or an AI mesh into a character a game can actually use — clean topology, a real skeleton, baked maps, and an export for Unreal, Unity and glTF.

Android lab

App Intelligence

Open an Android app you are allowed to test and see how it really works — every screen, the code behind it, and the servers it talks to. Then repeat a task on one phone or a hundred.

apksee.io Open live
ApkSee — See inside any Android app. — website preview Explore the live site

ApkSee

Desktop · Windows

ApkSee decompiles Kotlin, Java, Hermes, Flutter and Unity, maps live traffic to the exact button, and replays a task across phones you control. The app never leaves your machine.